Thien Tan 1.4 Solar Power Plant 100 MWp
Overview
Location
Thuan Bac District, Ninh Thuan Province
Scope of work:
EPC General Contractor
Time:
COD: 10/2023
Investor:
T&T Group
Thien Tan 1.4 Solar Power Project, invested by Ninh Thuan Energy Investment and Development Company Limited (a member unit of T&T Group), was approved for investment policy on October 29 /2020.
The project has a capacity of 100 MWp; Total investment cost is 1,938 billion VND; Electricity output is 156 million KWh/year. The project is situated in Phuoc Chien commune, Thuan Bac district.