My Hiep Solar Power Plant 50 MWp
The first project in which NSN plays two roles as The Owner and EPC Contractor.Overview
The project has a total investment of more than 1,200 billion VND, is built on an area of 58.27 ha in My Hiep commune, Phu My district, Binh Dinh province and the total installed capacity of the plant reaches 50 MWp. Application of Huawei String Inverter technology with 7 AC stations, 229 String inverters, and 113,624 mono half-cell 440wp PV modules with a conversion efficiency of 19.91% provided by Sharp Corporation – Japan.
The project was designed and implemented by Consortium SESJ -SSSA -NSN, which has experience in implementing projects such as TTC Phong Dien Solar Power Plant, TTC Ham Phu 2 Solar Power Plant, Phuoc Ninh Solar Power Plant and, etc. Besides, under the strict management and supervision of Bureau Veritas Company from France, My Hiep Solar Power Plant did not only get COD on schedule, enjoy the FIT 2 of 7.09 UScent / kWh but also ensure the criteria of safety, technology, and quality during 20 years of operation.
Overcoming nearly 6 months of construction and installation, efforts to withstand the challenges of weather and the COVID-19 epidemic, My Hiep Solar Power Plant officially energized on December 11, 2020. During operation, the plant will contribute to the national grid with 82 million kWh / year of electricity output, contributing to reducing CO2 emissions to the environment by about 54 thousand tons/year.